4/14/2012

( Patterson Family – 139 Fair Street)

Floor system at beginning of day (6:18am)

 

Installing floor joist braces (7:51am)

 

Registration

 

Saw crew

 

Building pars and corners

 

Installing floor joist braces

 

Morning Devotional (8:37am)

 

Framing the first wall (back wall) (8:57am)

 

Nailing down the floor decking

 

Install OSB sheeting on back wall (9:15am)

 

Future home owners – Mr & Ms Patterson

 

Wrapping first wall

 

First wall ready to set up (9:53am)

 

First exterior wall (back wall) raised and set in place (9:54am)

 

Second exterior wall (front wall) raised and set in place (11:40am)

 

Third exterior wall (left side wall) raised and set in place (12:47am)

 

Fourth exterior wall (right side wall) raised and set in place (12:58am)

 

OSM sheeting installed on exterior side wall (1:24pm)

 

Jesus Christ Heavenly devoted son patch

 

Build status at end of day (2:30pm)

 